Overview#

Taraba is the Mambilla Plateau hydropower state — the long-delayed 3,050 MW Mambilla Hydroelectric Project (planned since 1972; financing closed 2017 with China Exim Bank; construction stalled by the 2017 ICSID Sunrise Power & Transmission Company arbitration) would be the largest single power station in sub-Saharan Africa. It also has lead-zinc-barytes in the Middle Benue Trough, the Mambilla highland tea estate, and substantial coal.

Geology & Deposits#

Hydropower. Mambilla Plateau — Donga River — proposed 3,050 MW plant (Gembu LGA). Construction not commenced as of 2024 owing to arbitration. Lead-zinc-barytes. Wukari, Ibi, Takum — Middle Benue Trough. Coal. Lamja-Salihi, Akwana — sub-bituminous. Tin, columbite. Mambilla plateau small. Limestone, kaolin, gypsum. Various. Hydrocarbons. None. Tea & coffee. Mambilla Plateau — NITEL/Mambilla Beverage Limited Tea Estate, Kakara — the only commercial tea estate in Nigeria. Agricultural produce. Yam, rice, sesame, ginger, coffee (small).

Operators & Output#

- NIETU / Federal Ministry of Power — Mambilla project sponsor. - Sunrise Power & Transmission Company — ICSID claimant (2017). - Mambilla Beverage Ltd — Kakara tea estate. - Small-scale Pb-Zn artisanal operators — Ibi, Wukari.

Host-Community & Revenue#

No oil derivation. The Mambilla project, if built, would relocate ~100,000 residents in Sardauna LGA; community-engagement plans have repeatedly been redrawn.

Current Status#

Producing: Kakara tea (small-scale), Wukari-Ibi Pb-Zn (artisanal), yam and rice. Frontier: Mambilla Hydroelectric Project.

References

Sources#
  • Sunrise Power & Transmission Company Ltd v Federal Republic of Nigeria, ICSID Case No. ARB/17/29.
  • Federal Ministry of Power — Mambilla project status reports.
  • Mambilla Beverage Ltd.
Methodology

Tier 1 · primary

Courts. Gazettes. National archives.

Tier 2 · corroborating

OCCRP. HRW. BudgIT. TheCable.

Tier 4 · tertiary, flagged

Wikipedia only where primary is pending. Always labelled.